One lane 10–12 ft, 14 ft on curves. Two cars side by side 20–24 ft.

Layer depths after compaction

Base 4–6 in, 6 in over fabric or on soft ground. Middle 3–4 in. Top 2–3 in. Set a layer to 0 to skip it.

Your prices

Filled in with typical US prices. Swap in a local quote for a closer number.

Section across the driveway showing the stone layers, the crown and the fabric#3 or #4 stone#57 stoneCrusher run or #411Existing soil12 ft3 in crown4 in3 in3 in
Section across the driveway. Layer depths and the crown are drawn to one scale and change as you edit them. The width is not to scale.

Materials if you do it yourself

$3,340

Stone and 6 deliveries, at your prices

Hiring a contractor

$2,400–$3,600

At $1 to $3 per sq ft, a typical 2026 range. Deep builds and digging out cost more.

66 tons of stone

That is about 46.3 cubic yards of loose stone for 1,200 sq ft, 10 in deep after compaction. Includes 25% extra for compaction.

What to buy
Base: #3 or #4 stone26 tonsor 19 cu yd$1,040
Middle: #57 stone20 tonsor 14 cu yd$900
Top: crusher run or #41120 tonsor 14 cu yd$800
Delivery6 loads13 tons each$600

How many tons of gravel for a driveway?

Length × width × depth gives cubic feet. Divide by 27 for cubic yards, add 25 percent because loose stone packs down, and multiply by 1.4 for tons. The table uses the calculator's three-layer build, 10 inches deep after compaction (4 in of base, 3 in of #57, 3 in of crusher run), and a 2-inch top-up of an existing driveway. Each stone is rounded up to a whole ton.

SizeNew, 10 inTandem loadsTop-up, 2 in
10 × 50 ft29 tons36 tons
12 × 50 ft33 tons37 tons
12 × 100 ft66 tons613 tons
20 × 50 ft56 tons611 tons
12 × 250 ft163 tons1333 tons
12 × 500 ft326 tons2665 tons

What size gravel for a driveway?

A gravel driveway is built like a small road: big stone at the bottom to carry the load, smaller stone above it, and a dense mix on top that packs hard. Use crushed stone. Its broken faces lock together, while round river rock and pea gravel roll under tires.

LayerStoneSizeDepth
Base#3 or #4 stone2 to ¾ in4–6 in
Middle#57 stone1 in to ³⁄₁₆ in3–4 in
TopCrusher run or #4111½ in to dust2–3 in

The numbers are standard AASHTO sizes: #3 is stone from 2 to 1 inch, #4 from 1½ to ¾ inch and #57 from 1 inch to ³⁄₁₆ inch. Crusher run is crushed stone with the dust left in. The fines bind the top layer into a crust that sheds water. Clean #57 has no fines, so on top it stays loose. Crusher run has many local names: crush and run, dense-graded aggregate (DGA), quarry process, road base, CR-6, 2A or Class 5. #411, named after an Ohio road spec, is a similar dense mix for the top. If in doubt, ask the yard for its dense-graded driveway topping.

How deep should a gravel driveway be?

Plan on 8 to 12 inches of compacted stone for a new driveway on firm ground, and more on soft clay or where trucks drive. The calculator starts at 10 inches.

  • Strip the sod and topsoil down to firm ground. Topsoil holds water and lets stone sink.
  • On clay, silt or wet ground, lay woven geotextile first, overlapping the strips. It keeps mud from pumping up into the stone. Make the first layer over it at least 6 inches thick, and don't drive on bare fabric.
  • Shape a crown: the center ½ inch higher than the edges for every foot out from the middle, so 3 inches on a 12 ft driveway. Water then runs off instead of standing in the wheel tracks. On a hillside, tilt the whole width toward the downhill side instead.
  • Spread and compact in lifts of no more than 4 inches with a plate compactor or small roller.
  • Hold the edges. Cut a 3 to 4 inch shoulder into the soil along each edge, or set edging, so the stone doesn't spread into the lawn.
  • If the driveway crosses a roadside ditch, the county usually requires a permit and a culvert pipe, often 12 to 18 inches across.

Every 2 to 4 years, grade out potholes and ruts, restore the crown and add fresh top stone where the base shows through. Use "Top up an existing one" in the calculator for that.

Gravel by the ton or by the cubic yard?

Quarries and landscape yards weigh stone on a truck scale, so most sell it by the ton. Some sell by the cubic yard. A loose cubic yard of crushed stone weighs about 1.4 tons, so 10 tons is about 7 cubic yards. Weight varies with the rock and how wet it is, so ask the yard for its figure. Order for loose volume: stone packs down as you compact it, so the calculator adds 25 percent to the finished depth. Here is how far one ton goes:

Depth after compactionOne ton coversTons per 100 ft, 12 ft wide
1 in185 sq ft6.5
2 in93 sq ft13.0
3 in62 sq ft19.4
4 in46 sq ft25.9
6 in31 sq ft38.9

What a gravel driveway costs

Stone runs about $35 to $60 per ton at landscape yards (2026 price lists), often less straight from a quarry, plus about $50 to $150 per truckload for delivery. A small single-axle dump truck carries about 5 tons, a tandem about 13 and a tri-axle about 18. Each stone comes as its own load unless the yard agrees to split one, and many won't deliver less than 3 tons.

Hired out, a new gravel driveway costs about $1 to $3 per square foot (2026 cost guides). The low end is a few inches of stone on firm ground. A full three-layer build, digging out soft soil, fabric and long hauls push it to the top of the range or past it. Topping up an existing driveway with regrading runs about $0.25 to $1 per square foot.

Stone and trucking are most of the bill, and contractors pay quarry prices, so get a quote even if you plan to do it yourself. Doing it yourself, you still need a way to spread the stone, such as a rented skid steer or a tractor with a box blade, and a plate compactor.

How the calculator works

  1. Area in square feet: length × width.
  2. Each layer in compacted cubic yards: area × depth in inches ÷ 12 ÷ 27.
  3. Loose stone to order: plus 25 percent for compaction.
  4. Tons: loose cubic yards × 1.4, rounded up to a whole ton for each stone. Cubic yards are rounded up to the next half yard.
  5. Truckloads: tons of each stone ÷ the truck's payload, rounded up, one stone per truck.
  6. Fabric: the area plus 10 percent for overlaps.
  7. Crown: half the width in feet × ½ inch.
  8. Contractor: area × $1 to $3 per sq ft for a new driveway, $0.25 to $1 for a top-up.

Common questions

How much gravel do I need for a 100-foot driveway?

For a 12 ft wide driveway built in three layers, 10 inches deep after compaction, order about 66 tons: 26 tons of #3 or #4 stone, 20 tons of #57 and 20 tons of crusher run. That is 6 loads on a tandem dump truck. A 2-inch top-up of the same driveway takes about 13 tons. Both include 25 percent extra because loose stone packs down.

How much does a gravel driveway cost?

Hired out, about $1 to $3 per square foot in 2026, or $2,400 to $3,600 for a 12 × 100 ft driveway. Doing it yourself, the stone and 6 deliveries for the 10-inch build come to about $3,340 at the example prices in the calculator, so get a contractor quote too. A 2-inch top-up is about $620 in stone and delivery.

How many tons of gravel are in a dump truck load?

About 5 tons in a small single-axle dump truck, 13 to 15 in a tandem and 18 to 22 in a tri-axle. The calculator uses the low end of each. The real payload depends on the truck and local weight limits, so ask the yard. Each stone usually comes as its own load, so a three-layer driveway needs at least three deliveries.

Do I need fabric under a gravel driveway?

On clay, silt or ground that stays wet, yes. Woven geotextile laid on the soil keeps mud from pumping up into the stone, so the base doesn't sink. It costs about $0.10 per square foot in large rolls. Overlap the strips by at least 6 inches, more on soft ground, make the first layer of stone at least 6 inches thick and don't drive on bare fabric. On sandy or gravelly soil that drains well, it is often skipped.

Should I use crusher run or #57 on top?

Crusher run, for most driveways. It is crushed stone with the dust left in, and the fines bind the surface into a hard crust that sheds water. Clean #57 has no fines, so on top it stays loose and moves under tires, though it drains well. That is why #57 usually goes in the middle and crusher run or #411 on top. Use crushed stone, not round pea gravel or river rock, which rolls out of the wheel tracks.

How often should I add gravel to my driveway?

Every 2 to 4 years for most driveways, or when the base starts to show through. Before adding stone, grade out potholes and ruts and restore the crown so water runs off. A 2-inch top-up of a 12 × 100 ft driveway is about 13 tons, one tandem load.